The Urban Developer
AdvertiseEventsWebinarsUrbanity
Industry Excellence
Urban Leader
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
Build-to-RentVanessa CrollTue 24 Jun 25

Perth Timber Skyscraper on Global Map

Erben Perth Timber Tower

Perth now holds approvals for two of the world’s tallest hybrid timber towers, after Erben’s 35‑storey fringe‑CBD project was greenlit.

Plans for the 119m-tall build-to-rent development at 108 Stirling Street, lodged in January, were approved this month by the Metro Inner Development Assessment Panel.

It follows Grange Development’s 50‑storey, 191m-high C6 project in South Perth, which received approval in September 2023 but has since stalled—and its site is now for sale.

Erben plans to deliver 351 build-to-rent apartments and 64 short‑stay units within a hybrid structure of cross‑laminated timber, mass‑timber columns and a concrete core.

The 2266sq m site sits at the corner of Stirling and Aberdeen streets—350–400 m from McIver and Perth train stations, within the city’s free transit zone.

An existing vacant lowrise building, built in 1988, will be demolished to make way for construction.

The site received approval in 2017 for a 34‑storey mixed‑use tower, though that proposal did not proceed.

The approved scheme provides 3000sq m of communal amenity, 900sq m of resident storage, podium and rooftop gardens, a public forecourt, and improved streetscape planting—including retention of mature trees and 35 new plantings.

Rothelowman rendering of Erben's approved 35-storey hybrid timber tower at 108 Stirling Street in Perth.
▲ Rothelowman rendering of Erben’s approved 35-storey hybrid timber tower at 108 Stirling Street in Perth.

Rothelowman principal Kylee Schoonens said the tower’s green spaces would play a central rather than decorative role.

“It’s our way of stitching this precinct into the fabric of the city, creating a natural pause point that invites people in, encourages movement, and supports a more connected, walkable Perth,” she said.

Following Erben's sustainability-focussed developments, managing director Luke Reinecke said 108 Stirling Street would continue the company’s commitment to five-star green ratings.

“This is an exciting project for us and will offer the Perth market something unique through its innovative and sustainable design, extensive use of timber, and strong community-focused offering,” Reinecke said.

“It comes at an important time for Perth, when increasing housing supply is of utmost focus,” he said.

Erben Perth Timber Tower outdoors
▲ Landscaped public spaces aim to create a green, walkable connection at street level.

Sustainability features include rooftop solar panels, urban-heat‑mitigating landscaping, retained street trees, and links to public transport and cycling infrastructure.

Erben, a Perth‑based developer founded in 2005 by brothers Luke and Bob Reinecke (formerly Stirling Capital), has delivered more than $1 billion in residential projects, including The Switch, Cirque, Cirque Duet, Florin Parkside and Treehouse Apartments.

Cirque achieved a 5‑Star Green Star design rating, the first of its kind in WA, reportedly cutting lifecycle carbon emissions by 44 per cent and water use by 25 per cent.

The 39-storey Atlassian Central is expected to open in 2027.
▲ The 39-storey Atlassian Central is expected to open in 2027.

Several taller hybrid timber towers already exist internationally.

Ascent MKE in Milwaukee stands 25 storeys and about 87 m tall, and in August 2022 overtook Norway’s Mjøstårnet—an 18‑storey, 85.4 m timber structure completed in 2019—as the world’s tallest mass‑timber building.

In Sydney, Atlassian Central is rising to 39 storeys (182 m) and is due to become the world’s tallest hybrid‑timber commercial tower on completion in 2026.

A proposed 37‑storey Canada Earth Tower in Vancouver remains on hold.

And Japanese developer and global wood company Sumitomo Forestry plans to build a 350m, 70‑storey hybrid timber tower in central Tokyo by 2041, making it the tallest of its kind by more than 150 metres.

Construction on 108 Stirling Street is expected to begin in 2026 and complete in 2028.

ResidentialPerthDevelopmentArchitectureSustainabilityApprovalProject
AUTHOR
Vanessa Croll
The Urban Developer - Journalist
More articles by this author
ADVERTISEMENT
TOP STORIES
Exclusive

No Cookie Cutters: Finding Feasibility in HAFF Projects

Patrick Lau
6 Min
Exclusive

Brisbane Transaction Activity Steams Ahead for A-Grade Residential

Taryn Paris
5 Min
Exclusive

Starchitect Ivan Harbour on the Power of Small Spaces

Taryn Paris
6 Min
Stockland bumps up its apartment pipeline in melbourne and sydney
Exclusive

Stockland Re-Enters Density in $5bn Apartment Play

Renee McKeown
4 Min
Woolloongabba Precinct Vulture St
Exclusive

Brisbane Developer in Cross River Rail Compensation Tussle

Clare Burnett
4 Min
View All >
the plans are for a four-storey development with 20 apartments at 52 The Parade, Norwood just down from the 1851-built pub The Colonist, just outside the city centre.
Residential

Bid to Downsize Norwood Shoptop Apartment Scheme

Renee McKeown
Gabba Carl St Modular DA render hero
Development

Nine Month Build: Modular Highrise Pitched for Gabba

Phil Bartsch
Exclusive

No Cookie Cutters: Finding Feasibility in HAFF Projects

Patrick Lau
As affordable and social housing development goes up a gear, a summit has been told not to look for a single secret to s…
LATEST
the plans are for a four-storey development with 20 apartments at 52 The Parade, Norwood just down from the 1851-built pub The Colonist, just outside the city centre.
Residential

Bid to Downsize Norwood Shoptop Apartment Scheme

Renee McKeown
2 Min
Gabba Carl St Modular DA render hero
Development

Nine Month Build: Modular Highrise Pitched for Gabba

Phil Bartsch
4 Min
Exclusive

No Cookie Cutters: Finding Feasibility in HAFF Projects

Patrick Lau
6 Min
Revelop Stockyards EDM
Retail

Revelop Scoops Up Camden Stockyard Site, Plots Retail

Clare Burnett
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://uat.theurbandeveloper.com/articles/erben-hybrid-timber-tower-108-stirling-perth-tallest-approved