The Urban Developer
AdvertiseEventsWebinarsUrbanity
Industry Excellence
Urban Leader
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
FROM SITE SELECTION TO DELIVERY PROPERTY DEVELOPMENT MASTERCLASS
PROPERTY DEVELOPMENT MASTERCLASS
LEARN MOREDETAILS
On Demand

Fireside Chat | Inside GemLife With Adrian Puljich

Building Australia's Newest Airport: Multiplex

The Makers Of The Mondrian | Design, Vision And Delivery Behind One Of Australia’s Most Anticipated Luxury Hotels

Next Gen Now | How Emerging Developers Are Redefining The Game

View All >
Latest News
ASX-listed Eureka Group Holdings is expanding its rental offering to all ages, picking up a community in Perth for $22.15 million. The 200-site all-ages Hillside Garden Village in Mount Richon.
Land Lease Communities

Eureka Expands All-Ages Assets with $22m Perth Deal

Renee McKeown
2 Min
The Spit Ignite Projects hero
Placemaking

Luxury Gateway to Unlock The Spit’s New Superyacht Era

Phil Bartsch
5 Min
Dexus 636 St Kilda Road HERO
Planning

Dexus Reveals Apartment Tower for St Kilda Office Site

Leon Della Bosca
3 Min
Toll is among logistics tenants to have previously contracted Westlink sites.
Industrial

ESR Greenlit for Second Stage of Westlink Industry Park

Patrick Lau
2 Min
View All >
Events
One-Day Course

Property Development Masterclass | Brisbane

One-Day Course

Property Development Masterclass | Melbourne

Breakfast

2025 Property and Economic Outlook | Greater Melbourne

Breakfast

2025 Property and Economic Outlook | Greater Sydney

View All >
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
SHARE
print
Print
Sponsored ContentPartner ContentTue 30 Sep 25

Data Centre Downtime: Utility Infrastructure Dependencies

Property owners and investors are betting big on data centres, but utility and infrastructure risks could quietly erode the success of these projects if left unaddressed.

As data centres continue their transformation from a niche asset class to institutional investor favourite, the conversation has rightly shifted from hype to fundamentals. Including uptime, energy efficiency, and long-term resilience.

But while much attention is paid to cybersecurity and energy sourcing, another critical risk is often hiding in plain sight: the infrastructure that keeps a data centre running is rarely fully within your control.

From shared utility corridors to offsite substations and fibre exchanges, these dependencies introduce a web of operational, legal and insurability challenges that can catch even seasoned developers off guard.

Invisible but critical: what infrastructure risks really look like


Most data centre stakeholders are across the need for dual power feeds. 

But fewer understand that both power feeds might travel through the same conduit, across the same easement, or be supplied via a single point-of-failure substation kilometres away.

Scenario example:

A developer commissions a Tier III facility with dual power feeds. 

On paper, the system is resilient. But a major civil works project severs the underground conduit that carries both feeds along a shared route. 

Result: complete outage, and a lengthy insurance negotiation.

Why insurers are paying close attention


Insurers are increasingly scrutinising not just what’s on site, but how and from where critical services are delivered.

We’re seeing greater focus on:

  • Single points of failure in offsite electricity, water or cooling infrastructure

  • Uninsurable third-party infrastructure with unclear ownership or maintenance regimes

  • Inadequate documentation or mapping of critical utility routes.

This scrutiny affects insurability, pricing, and the ability to secure adequate business interruption (BI) coverage. 

If there’s uncertainty around infrastructure resilience, some insurers will:

  • Apply exclusions or sub-limits for BI triggered by utility failure

  • Decline cover altogether for certain high-risk sites

  • Require independent infrastructure resilience assessments.

Beyond insurance: valuation risks


It’s not just about insurability. Hidden infrastructure risks can impact the success and longevity of a data centre project.

  • Exit hurdles: Investors undertaking due diligence may flag utility dependencies as red flags

  • Tenant hesitancy: Hyperscalers and enterprise tenants increasingly request resilience audits, SLAs with utility providers, and redundancy certifications

  • Cost creep: Retrofitting true route separation or infrastructure upgrades mid-project can be materially expensive.

What leading developers are doing differently


Sophisticated property groups are embedding infrastructure risk assessments early in site selection and design processes, such as:

  • Independent utility route audits

  • Negotiating custom SLAs with offsite utility providers

  • Designing in physical and geographical separation for power and fibre

  • Engaging with insurers during design to validate insurability.

The next frontier of data centre risk management


As competition in the data centre space intensifies, the difference between a Tier III facility on paper and a truly resilient asset comes down to the infrastructure.

Property owners and developers who proactively address offsite utility risks are often better placed to secure tenants, insurance, and long-term value.

At Lockton, we work closely with developers, investors, and insurers to identify and help manage the full spectrum of risks, both visible and hidden, across the data centre lifecycle. 

If you're planning or investing in a data centre, talk to us about how we can help future-proof your project from the ground and the grid up.



The Urban Developer
is proud to partner with Lockton to deliver this article to you. In doing so, we can continue to publish our daily news, information, insights and opinion to you, our valued readers.

Contact:

Phil Clauzel
National manager
Lockton Real Estate and Construction
+61 403 263 168

The contents of this publication are provided for general information only. Lockton arranges the insurance and is not the insurer. While the content contributors have taken reasonable care in compiling the information presented, we do not warrant that the information is correct. The contents of this publication are not intended as a legal commentary or advice and should not be relied on in that way. It is not intended to be interpreted as advice on which you should rely and may not necessarily be suitable for you. You must obtain professional or specialist advice before taking, or refraining from, any action based on the content in this publication.

© 2025 Lockton Companies Australia Pty Ltd.

IndustrialInfrastructureAustraliaPartner
AUTHOR
Partner Content
More articles by this author
TOP STORIES
Hotel Indigo Adelaide hero
Exclusive

Neighbourhood Hotels Reinvent Urban Hospitality

Clare Burnett
5 Min
Melbourne CBD empty site
Exclusive

Melbourne Developers Hit Back at Mayor’s ‘Lazy Landlord’ Plans

Leon Della Bosca
7 Min
The land value of many fuel retailing sites is outweighing their operational value.
Exclusive

Shrinking Servo Network Heralds Development Prospects

Patrick Lau
7 Min
Sydney airspace
Exclusive

Money Out of Thin Air: The Multibillion-Dollar Rooftop Housing Play

Vanessa Croll
8 Min
Construction

Surgical Precision: Robots Rise in Complex Demolition Job

Taryn Paris
6 Min
View All >
Article originally posted at: https://uat.theurbandeveloper.com/articles/data-centre-downtime-utility-infrastructure-dependencies