The Urban Developer
AdvertiseEventsWebinarsUrbanity
Industry Excellence
Urban Leader
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
TransportMarisa WikramanayakeTue 29 Jul 25

Perth’s $1.33bn Metronet Expansion Enters Final Stretch

A rendering of the new elevated Armadale Train Station in Perth's southeast.

The biggest transformations of Perth’s rail network in more than a century, the Armadale Line and the new Byford Rail Extension, are due to open in three months.

Part of Perth’s Metronet program, the Armadale Line and the new elevated Armadale Train Station with 200 carparking bays have been completed while on the Byford Rail Extension, which adds 8km of dual-rail track to the south of the Armadale line, works have concluded on the new Byford Train Station with 400 carparking bays.

Works on the latter also included removing seven level crossings, new road-over-rail bridges at Thomas Road and Eleventh Road, 8ha of public open space and 8km of shared pedestrian and cycling paths.

Testing, commissioning and driver training are now under way for the Byford Rail Extension.

The Rail Replacement Program also replaced 15km of track, pedestrian and vehicle level crossings, new drainage systems and improved overhead lines, communications and signalling between Kenwick and Sherwood stations while the Armadale Line was closed.

The Armadale Line’s inner section, Long Park, while not fully completed, has opened.

At 7km long, Long Park has 14 community spaces with playgrounds, skate parks, dog and fitness parks and sports courts.


The Western Australian and the Federal Governments jointly funded the $1.33-billion project.

The Australind train will resume services in early 2026 after diagnostic testing for new trains at the Bellevue railcar facility. 

InfrastructurePerthTransportCompletionProject
AUTHOR
Marisa Wikramanayake
The Urban Developer
More articles by this author
ADVERTISEMENT
TOP STORIES
Exclusive

No Cookie Cutters: Finding Feasibility in HAFF Projects

Patrick Lau
6 Min
Exclusive

Brisbane Transaction Activity Steams Ahead for A-Grade Residential

Taryn Paris
5 Min
Exclusive

Starchitect Ivan Harbour on the Power of Small Spaces

Taryn Paris
6 Min
Stockland bumps up its apartment pipeline in melbourne and sydney
Exclusive

Stockland Re-Enters Density in $5bn Apartment Play

Renee McKeown
4 Min
Woolloongabba Precinct Vulture St
Exclusive

Brisbane Developer in Cross River Rail Compensation Tussle

Clare Burnett
4 Min
View All >
Sponsored

Infrastructure’s Next Decade: Bold, Enduring Public Value

Revelop Stockyards EDM
Retail

Revelop Scoops Up Camden Stockyard Site, Plots Retail

Clare Burnett
Gabba Carl St Modular DA render hero
Development

Nine Month Build: Modular Highrise Pitched for Gabba

Phil Bartsch
The 18-storey tower of 126 units could well set a construction record in the Queensland capital for a building of its si…
LATEST
Infrastructure

Infrastructure’s Next Decade: Bold, Enduring Public Value

3 Min
Revelop Stockyards EDM
Retail

Revelop Scoops Up Camden Stockyard Site, Plots Retail

Clare Burnett
3 Min
Gabba Carl St Modular DA render hero
Development

Nine Month Build: Modular Highrise Pitched for Gabba

Phil Bartsch
4 Min
the plans are for a four-storey development with 20 apartments at 52 The Parade, Norwood just down from the 1851-built pub The Colonist, just outside the city centre.
Residential

Bid to Downsize Norwood Shoptop Apartment Scheme

Renee McKeown
2 Min
View All >
ADVERTISEMENT
Article originally posted at: https://uat.theurbandeveloper.com/articles/armadale-byford-metronet-perth-extension-open-wa