The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Partner Lab
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
RetailMarisa WikramanayakeThu 09 May 24

Mirvac Sells CBD Site, SP Setia Files Skyscraper Plans

Cox Architects have designed a new look for a 71-storey skyscraper proposed by SP Setia on a formerly owned Mirvac site in Melbourne's CBD.

Malaysian developer SP Setia has filed amendments for a permit previously granted for a site that developer Mirvac recently sold in Melbourne’s CBD.

The Australian developer had in 2020 applied for a permit to build a 31-storey office tower at the 383 La Trobe Street site, rather than a 71-storey apartment and hotel project approved in 2016. 

The 2024 half-year results for Mirvac show that it had exchanged contracts for the site as part of $480 million in assets sold that also included 60 Margaret Street and the MetCentre in Sydney. The 383 La Trobe Street site made $88 million while 60 Margaret Street and the MetCentre fetched $389 million.

Mirvac declined to comment further on the sale.

SP Setia has now filed proposed changes with the Victorian Department of Transport and Planning. The developer wants to change the design, retain the 2016-permit approved 71 storeys, and remove the hotel component in favour of more apartments.

Cox Architecture has designed the new plans for the project on the 2850sq m site, which once was the site of the Royal Mint.

On documentation before the department, Urbis is listed as the planners, SP Setia is listed as the developer and Mirvac as the owner, as settlement of the sale is expected in the second half of 2024.

The proposal now comprises 797 apartments with 163 studio, 373 one, 206 two and 55 three-bedroom apartments from the 2nd to 71st floors.

Eight retail tenancies would occupy the ground and first floor as part of an arcade, with 3730sq m of residential amenity also provided. 

The original permit had 916 hotel rooms and 488 apartments.

The plans also show 110 carparking spaces and 250 bicycle storage spaces across four basement levels.

The render for the podium for SP Setia's new skyscraper project at 383 La Trobe Street in the Melbourne CBD.
▲ The render for the podium for SP Setia’s new skyscraper project at 383 La Trobe Street in the Melbourne CBD.

The planning report said that the expiry conditions of the original permit granted in 2016 for a mixed-use project on the site include a commencement deadline of July 27, 2024 and an completion deadline of July 27, 2026. SP Setia has lodged a request to extend the permit.

It has also requested a change in the permit conditions to allow for demolition to begin before the plans are endorsed to help speed up construction and to allow the permit to reflect the new plans and architects.

Permits and transactions


The site has a complex history of ownership and planning permission.

In 2015, Investa sold the site to developer Sterling Global for $70.7 million.

Sterling Global then applied for a permit for a 70-storey mixed-use project—ideally a hotel and apartment skyscraper designed by French architect Jean Nouvel. 

Planning permission was granted for demolition of the existing five-storey office building and the construction of a mixed-use building  in November, 2016.

Conditions of that permit included that a heritage-listed wall associated with the former Royal Mint site was expected to be stabilised prior to construction and that Ateliers Jean Nouvel Architects would be retained for the construction of the 71-storey building. 

The permit was amended in 2018 to change the wording of the expiry conditions, which placed a commencement deadline of 2018 and a completion deadline of 2020. 

A comparison of the two designs for the skyscraper: Atelier Jean Nouvel Architects' design from 2016 (left) and Cox Architecture's design from 2024 (right).
▲ A comparison of the two designs for the skyscraper: Atelier Jean Nouvel Architects' design from 2016 (left) and Cox Architecture's design from 2024 (right).

Sterling Global sold the site to Mirvac in September, 2018 for $122 million, according to CoreLogic property data. 

In May, 2020 Mirvac filed an application for a 31-storey office building, with plans designed by Cox Architecture and construction planned to start in 2022. 

It was intended to help prepare for the city’s recovery from Covid and included lifestyle and retail amenities, and a wellness centre.

In June, 2021 the City of Melbourne endorsed this second set of plans.

The expiry conditions have since been amended to the current commencement deadline of 2024 and completion deadline of 2026.

Mirvac identified the site in its half yearly ASX results for 2024 as a non-core asset. 

SP Setia is known for developing the Shangri-La hotel and Sapphire by the Gardens twin tower project at 318 Exhibition Street also in Melbourne’s CBD and a few blocks east of the 383 La Trobe Street site. 

Cox Architecture's design for the fins on the roof of the skyscraper project that SP Setia has proposed.
▲ Cox Architecture’s design for the fins on the roof of the skyscraper project that SP Setia has proposed.

The development firm listed the 500-key hotel for sale in 2022 for $500 million, therefore valuing each room at $1 million. 

Mirvac is currently focusing on build-to-rent projects such as the completed Liv Munro near the Queen Victoria Markets and the Liv Aston project near the Melbourne Exhibition and Convention Centre, which is nearing completion.

The Urban Developer contacted SP Setia and Mirvac for comment prior to publication.

ResidentialAustraliaMelbournePlanningPlanningDeal
AUTHOR
Marisa Wikramanayake
The Urban Developer
More articles by this author
ADVERTISEMENT
Murdoch Hospital EDM
Healthcare

Specialist $68m South Perth Hospital Green Lit

Clare Burnett
Fabcot Hero
Residential

Fabcot Wins Gateway Approval for Neutral Bay Shoptop

Ralph Nicholson
Architectus' design for Lendlease's Collins Wharf 5 and Collins Wharf 6 in Melbourne's Docklands.
Other

Lendlease Files Triple Tower Plan at Collins Wharf

Marisa Wikramanayake
The developer has continued with plans for a march of towers descending in height along a wharf at Melbourne’s Docklands…
LATEST
Murdoch Hospital EDM
Healthcare

Specialist $68m South Perth Hospital Green Lit

Clare Burnett
2 Min
Fabcot Hero
Residential

Fabcot Wins Gateway Approval for Neutral Bay Shoptop

Ralph Nicholson
5 Min
Architectus' design for Lendlease's Collins Wharf 5 and Collins Wharf 6 in Melbourne's Docklands.
Other

Lendlease Files Triple Tower Plan at Collins Wharf

Marisa Wikramanayake
3 Min
Leigh Creek Outback Resort hero
Other

‘Outback Hollywood’ Resort Oasis Up for Grabs in SA

Phil Bartsch
2 Min
View All >
ADVERTISEMENT
Article originally posted at: https://uat.theurbandeveloper.com/articles/sp-setia-mirvac-residential-skyscraper-mint-la-trobe-amendments
SHARE
print
Print
TOP STORIES
Looking to the future and futher out to far Western Sydney’s Development Dilemma
Other

[+] Death Spiral: Hope Fading for Western Sydney New Builds

Renee McKeown
6 Min
Build-to-Rent

[+] Duplexes and Walk-Ups the Next Wave of Build-to-Rent

Taryn Paris
6 Min
Goldie Goes West hero
Other

[+] Gold Coast’s Tide of Development Washes Over the West

Phil Bartsch
8 Min
Other

[+] ‘Grab the Reins, Hold Tight’: Fouad Deiri

Clare Burnett
5 Min
Other

[+] Property Sector’s Nervous Wait for Federal Budget

Marisa Wikramanayake
8 Min
View All >